Sunday, July 27, 2014

A Year of Projects - July 27th 2014



This past week I was able to cast on my Stage Six socks.  They are toe up and double knit and are taking me forever to finish!!  Who am I kidding - I am am making very slow progress with these!!  I find DK to be very slow and tough on my hands.  I also find it difficult to get my tension nice and even...  This is all I managed to get done this week (not likely I will finish before the deadline of July 31st...):


I also think I may be suffering from sock knitting burnout.  I have knit a lot in the past several months and all of it has been in speed/time limit conditions.  I am thinking I am ready for a break!  SO I started my sock scrap yarn afghan!!  I am thinking I may be addicted to making these little mitered squares!!  I am also not doing this in any planned design.  I will randomly choose each color as I am ready to add a new square.  The only condition I will place is that I do not want to have two colors that are too close in color to be side-by-side.  Otherwise the more random the better!!

So far it measures about 11.5 inches on each long side.  I have also tucked in all the tails except for those showing.  I will need to do the tails on a regular, frequent basis so it is not too overwhelming later!  Here is where I go to in the past few days:


Over the next week I am hoping to continue to work on the scrapghan, get a bit more done on my Stage Six socks, and maybe start assembling the crochet squares.

Progress Summary:
Sock Madness 8:
1. Chill Thrill (round 6 socks)
2. Alexandrina (round 7 socks)
Tour de Sock
1. Dazzle Them From Behind (Stage 4)  DONE!!  Finished July 18th 2014 Link to finished project page
2. Arch-Nemesis (Stage 5) Started July 18th 2014
3. Double Flake Squirrel Socks (Stage 6) Started July 21th 2014
Other WIPs to finish:
1. Advent Calendar scarf
2. Crochet scrap afghan 
3. Sock Scrap afghan Started July 24th 2014
Designs:
Coming soon :)

My Ravelry projects page for YOP4 is here with a full list of wips and completed projects.

To check out other blogs taking part in YOP4 or to join head on over to the Ravelry group over here.

Monday, July 21, 2014

A Year of Projects - July 6th 2014


Here are a few pictures of where I am at this week.

Tour de Sock
1. Dazzle Them From Behind (Stage 4) - I have the legs on both complete now and am ready to go on to the heels.  I am making good progress here!  In order to qualify for competition points I need to have it done by July 19th - I think I am on track to make it on time.



Other WIPs to finish:
1. Advent Calendar scarf (6 out of 24 lace repeats complete) I have made zero progress on this in the past year and need to decide if I will finish it or frog it...



2. Crochet scrap afghan (77 little squares complete plus 9 partially done squares)  This also had no progress since last year...  I really need to either start making some more squares, or start sewing the squares together and call it done.  I think this might make for a couple small baby afghans.



3. I want to start a scrap afghan with all my left-over sock yarn - This is the one I want to make!  Here are a bunch of the little balls of leftovers I have ready to go.  I just need to start going with this one!!




This basically sets up my beginning status on my projects!  I hope to keep on track updating this on a regular basis.


A Year of Projects - July 21st 2014


Update number one!!  I managed to make some progress on my Tour de Sock socks while I was away on vacation.  I did not finish my Stage 4 socks quickly enough to qualify for points, but I did get them finished!  I also managed to cast on my Stage 5 socks the day before the deadline but I got nowhere close to finishing them!  I am making good progress though.  The final stage (Stage 6) pattern was released on Saturday and I am ready to cast on today.  I hope to have them completed before the deadline of July 30th.  Time will tell!

My Tour de Sock Stage 4 socks are all done!!  This was a fun pattern and I enjoyed the knit!  It has beads into the pattern along the back of the leg, but my color choice was maybe not the best.  The beads are a fairly close match to the yarn color and do not show up too well...  Oh well :)
Tour de Sock Stage 4 complete!!
I also started my Tour de Sock Stage 5 socks!  I managed to get a decent amount done, but will put them aside so I can get moving on Stage 6.  I'll come back to these in a couple weeks.

My progress to date on Tour de Sock Stage 5.
And Tour de Sock Stage 6 began on Saturday.  It is toe-up double knit and I was suffering from jet lag so I plan to cast on later today!

This is my start for Tour de Sock Stage 6
I hope to have a fair bit of work done on my Stage 6 socks by next week!!

Progress Summary:
Sock Madness 8:
1. Chill Thrill (round 6 socks)
2. Alexandrina (round 7 socks)
Tour de Sock
1. Dazzle Them From Behind (Stage 4)  DONE!!  Finished July 18th 2014 Link to finished project page
2. Arch-Nemesis (Stage 5)
3. Double Flake Squirrel Socks (Stage 6)
Other WIPs to finish:
1. Advent Calendar scarf
2. Crochet scrap afghan 
3. I want to start a scrap afghan with all my left-over sock yarn - This is the one I want to make!
Designs:
Coming soon :)






Friday, July 4, 2014

A Year of Projects - Take 4


I have decided to join the Fourth Year of Projects blogging adventure.  I joined up in the First Year and managed to get a few projects done.  I again joined the Third Year and suspect I accomplished even less.  I am convinced that I overestimated my ability to finish up all the projects I chose!  This year I plan to finish up a few challenges that I started recently - I joined up Sock Madness 8 and Tour de Sock.  I finished five rounds of Sock Madness and three round of the Tour so far.  The fourth round of the Tour is ongoing right now as I post this. I plan to now finish up all that I did not complete and that which is yet to come on the Tour.  I also have a couple other WIPs that I will work towards completion!

So, without further ado, here is my list:

Sock Madness 8:
1. Chill Thrill (round 6 socks)
2. Alexandrina (round 7 socks)

Tour de Sock
1. Dazzle Them From Behind (Stage 4)
2. Yet to be released (Stage 5)
3. Yet to be released (Stage 6)

Other WIPs to finish:
1. Advent Calendar scarf (7 out of 24 lace repeats complete) I have made zero progress on this in the past year and need to decide if I will finish it or frog it...
2. Crochet scrap afghan (14 little squares complete)  This also had no progress since last year...  Or maybe I made a few more squares - I'll have to dig it out and see!
3. I want to start a scrap afghan with all my left-over sock yarn - This is the one I want to make!

And one final thing is that I want to continue working on designs.  I have designed several patterns over the past year or so and have many more ideas that need to be put on paper!!